File 271 - Laying down of a new water pipe and pump at Tullabeg

Identity area

Reference code

IE IJA FM/TULL/271

Title

Laying down of a new water pipe and pump at Tullabeg

Date(s)

  • 10 December 1948-4 November 1960 (Creation)

Level of description

File

Extent and medium

84 items

Context area

Name of creator

Archival history

Content and structure area

Scope and content

File relating to the laying down of a new water pipe and pump at Tullabeg and to (4 November 1960) fire prevention plans. Includes correspondence between the Fr Michael Connolly SJ, Rector, Fr Tom Scully SJ and Fr Patrick Cunningham SJ and various suppliers and a series of letters to the Rector from O’Gorman Quinn and Company, Fire Protection Engineers, Dublin relating to fire engines and extinguishers.

Appraisal, destruction and scheduling

Accruals

System of arrangement

Conditions of access and use area

Conditions governing access

Conditions governing reproduction

Language of material

Script of material

Language and script notes

Physical characteristics and technical requirements

Finding aids

Allied materials area

Existence and location of originals

Existence and location of copies

Related units of description

Related descriptions

Notes area

Alternative identifier(s)

Access points

Subject access points

Place access points

Genre access points

Description control area

Description identifier

Institution identifier

Rules and/or conventions used

Dates of creation revision deletion

Language(s)

Script(s)

Sources

Accession area